![]() |
| NKP 348 SD-9 at Adena Train Order Station, August 1958, Chuck Yungkurth photo |
Wednesday, January 14, 2015
Wednesday, January 7, 2015
Monday, January 5, 2015
More Pine Valley
Now with Pine Valley Yard at a proper height and the west end fitting together nicely in planning, I could move to mocking up the eastern end where the engine terminal is located.
Dillonvale's Pine Valley Yard was the home base to all the mine runs in the area and therefore needed engine facilities to support those operations. By the mid 1950's many of the yard's structures had been updated and gave the servicing area a more modern look.
I've always had a hard time compressing and cutting things out of my plans. I just want to stick to the prototype as close as possible, but I might have to draw the line at this coal tipple. Everything else looks like it could translate well into a model version. Here's the prototype.
Instead of braving the cold wind and snow and getting another piece of foam from the garage, I just used the basement floor, along with some flex track and paper switches to throw a quick mock up together.
It could be compressed a bit here and there, and yeah I did throw in the "roller coaster" coal tipple just to see... The roundhouse sadly didn't make the cut, as it would encroach to far into the aisle and isn't completely necessary with plenty of other track space for engines. A Walthers 90' turntable will be adequate for turning the W&LE/NKP I-3 2-6-6-2 engines with the smaller Mikado tenders.
Overall I'm happy to say that it looks like the engine terminal can work in the 10' of space allotted and look pretty close to the prototype.
In other news.
Earlier my friend Tim Moran had stopped by to share some ideas and help me plan the Adena Railroad with his track planning software. As a big surprise he brought over a decommissioned Free-Mo module for my son Brendan to play with while layout construction slowly starts.
Brendan quickly decorated it with some of his buildings and cars and happily switched it the rest of the evening! Thanks Tim!
Tim is a fellow Nickel Plate Road modeler with a focus in modeling a small section of Canton, Ohio. He is also involved with the Western Reserve Free-Mo group here in Northeast Ohio. The group joined up with other Free-Mo groups for a large display at the 2014 NMRA Convention in Cleveland this past summer that was a blast to see.
If you don't know what Free-Mo is check it out at http://www.free-mo.org/about
Dillonvale's Pine Valley Yard was the home base to all the mine runs in the area and therefore needed engine facilities to support those operations. By the mid 1950's many of the yard's structures had been updated and gave the servicing area a more modern look.
- 12 stall Roundhouse, 1908
- 105' Turntable, new 1947
- 200 Ton Coal Tipple, 1912
- Roberts & Schaefer Cinder Crane, new 1947
- Sand House & Bin, 1912
- 5 Ton Sand Tower, new 1947
- 195,000 gal Water Tank, 1939
![]() |
| W&LE Coal Dock Pine Valley Yard, Dillonvale, OH May 31, 1927 facebook.com |
![]() |
| Pine Valley Engine Terminal 1947 |
| Pine Valley Engine Terminal mock up |
Overall I'm happy to say that it looks like the engine terminal can work in the 10' of space allotted and look pretty close to the prototype.
In other news.
Earlier my friend Tim Moran had stopped by to share some ideas and help me plan the Adena Railroad with his track planning software. As a big surprise he brought over a decommissioned Free-Mo module for my son Brendan to play with while layout construction slowly starts.
Brendan quickly decorated it with some of his buildings and cars and happily switched it the rest of the evening! Thanks Tim!
Tim is a fellow Nickel Plate Road modeler with a focus in modeling a small section of Canton, Ohio. He is also involved with the Western Reserve Free-Mo group here in Northeast Ohio. The group joined up with other Free-Mo groups for a large display at the 2014 NMRA Convention in Cleveland this past summer that was a blast to see.
If you don't know what Free-Mo is check it out at http://www.free-mo.org/about
Sunday, January 4, 2015
Getting things started again, redo!
In my "Getting things started!" post last week, I hung metal shelf brackets along the wall at the only elevation I can run behind my basement steps for the upper level. With some pieces of pink foam and some flex track I mocked up a fairly prototypical but condensed version of the Pine Valley Yard in Dillonvale, Ohio.
I really liked the arrangement I laid out and I could better understand the flow and function of the yard in 3D rather than on paper. The only problem was it was just too high!
The elevation needed to get behind my stairs is at 62". I thought this height might be manageable, but I quickly realized it wasn't, especially for a yard 8 tracks wide at it's deepest point. Near the beginning of the yard there's about 12 feet to that clearance point, which meant I could drop the upper level about two inches creating an 1.25 to 1.5% grade. This is actually similar to the prototype where westbound trains are coming up out of the Ohio River Valley. So like the prototype, most trains headed west wouldn't be very long and based on previous tests should be able to handle that grade.
Another evening of work redoing all the shelving brackets and I was back in business, amazing the difference two inches can make! Using a step stool is now a lot more optional.
This time I took things a step further and started cutting some Atlas flex track and added some switches to actively test out the arrangement. A functional mock up I suppose. Lance Mindhiem has written about doing something similar, using Atlas snap switches and flex track to test and adjust before laying down Micro Engineering track on his CSX Miami layout.
I realized after inserting the above photo, it looks like I ballasted a temporary yard. It's actually a 1/8" black rubber mat used to prevent loads from shifting in semi trailers. I thought it could be an alternative type of subroad bed, and they were free as my work was just just throwing them away. So far the quieting effect when used on pink foam is extraordinary.
Doing all this has been great for my son who has been very excited to finally get to run some trains. Teaching him switching moves has been very entertaining as well! Thanks to Tim Moran for the idea to get something up and running for my son's enjoyment while the big picture gets worked out. Combining it with testing a possible future section of the layout really kills two birds with one stone.
I really liked the arrangement I laid out and I could better understand the flow and function of the yard in 3D rather than on paper. The only problem was it was just too high!
The elevation needed to get behind my stairs is at 62". I thought this height might be manageable, but I quickly realized it wasn't, especially for a yard 8 tracks wide at it's deepest point. Near the beginning of the yard there's about 12 feet to that clearance point, which meant I could drop the upper level about two inches creating an 1.25 to 1.5% grade. This is actually similar to the prototype where westbound trains are coming up out of the Ohio River Valley. So like the prototype, most trains headed west wouldn't be very long and based on previous tests should be able to handle that grade.
Another evening of work redoing all the shelving brackets and I was back in business, amazing the difference two inches can make! Using a step stool is now a lot more optional.
This time I took things a step further and started cutting some Atlas flex track and added some switches to actively test out the arrangement. A functional mock up I suppose. Lance Mindhiem has written about doing something similar, using Atlas snap switches and flex track to test and adjust before laying down Micro Engineering track on his CSX Miami layout.
| The new easier on the neck 60" high Pine Valley Yard. |
Doing all this has been great for my son who has been very excited to finally get to run some trains. Teaching him switching moves has been very entertaining as well! Thanks to Tim Moran for the idea to get something up and running for my son's enjoyment while the big picture gets worked out. Combining it with testing a possible future section of the layout really kills two birds with one stone.
Subscribe to:
Posts (Atom)


