Friday, March 29, 2019

Track work for Adena - Part 4

In this session I'll wrap up construction of Adena Yard with the the two final yard tracks and the spur for the Adena Mill and team track. I've added a track diagram from the W&LE Valuation maps so everybody knows what is what in these blog posts. Red marks the tracks added.

Click on this sentence for the valuation maps for the entire W&LE at Rails and Trails's website.

Tracks added in this blog post 3-21-19, Valuation Map from RailsandTrails.com

The last two shorter tracks south of the main need their west end turnouts and track laid. Here you can see the marks made with a silver sharpie to help position the tie strips and the turnouts once the adhesive caulk is spread. You can also see an invasion of my Son's modern equipment in the yard which I'm sure will cause some kind of time dimension paradox.


Below you can see the turnouts are now spiked down with the other yard tracks in place and connected to the turnouts.


While testing the two new turnouts I was concerned that particularly bad derailment could cause a quick trip to the floor. So I cut a strip of Plexiglas to serve as a barrier not only to a derailment but also an errant elbow or laundry basket. This step also pointed out the need for a layout fascia.



Due to the volume of hoppers that Adena handled there was a small RIP (repair in place) track that serviced the yard. This track extended from the bottom turnout that I just installed. Since I'm not sure of the final positioning or length yet, I left the track loose and unpowered for now.

Adena Yard RIP Track
In this photo of W&LE 6805 in Adena Yard, the RIP track can be seen to the far right with what looks like a Pennsylvania H-21 hopper sitting all alone on it. The other track that disappears to the right is the lead for the team and mill tracks.That's a great photo of the yard as well, check out the old caboose or car body acting as the car repair shed. The white fencing and pole lights surrounds the Adena High School football field.

W&LE 6805 in Adena Yard
I added the mill and team tracks in the same way, I left them both loose but I powered the team track as engines were often put on that track in between assignments. The foot print of the Adena Mill is to scale from Google Maps measurements. Last I saw in 2016, it was one of the few track side structures still standing.

Adena team and mill tracks.
And with that all major track work in Adena Yard is complete! Next up I start work on the Adena wye.


- Quick links

Track work for Adena - Part 1
Track work for Adena - Part 2
Track work for Adena - Part 3
Track work for Adena - Part 4
Track work for Adena - Part 5

Wednesday, March 27, 2019

Wednesday, March 20, 2019

Wordless Wednesday #165

W&LE Caboose 0201 and a coal hopper sit in Adena yard, photo by my son Brendan Ellis

Monday, March 18, 2019

Track work for Adena - Part 3

With the west end turnouts all set I can begin work on the east end yard ladder. My goal is to place the first two mainline turnouts and then connect the main though Adena. Then I can lay the seven yard tracks building of the mainline route.

As you can see below, the valuation map of the west end of Adena yard is fairly straight with a gentle curve to the right after the bridge.
East end of Adena Yard. Cropped image from RailsandTrails.com

My version of the yard ladder had to be severely curved left in order to fit along the wall. To help with planning I mapped the ladder out with printable Fast Track templates on a large piece of poster board.



The first turnout is a #8 30"/40" radius which I had already hand built from a paper template. The other turnouts I needed were five #8 32"/25" radius and one #6. Since I knew I needed at least six #8 32"/25" turnouts (one for the Adena wye) I felt I might as well order a new fixture from Fast Tracks.

Fast Track's Curved #8 32"/25" radius turnout


With the fixture in hand I made quick work of making what I needed and started committing the paper template to my rubber roadbed. First up was the #8 40"/30" turnout which beings the main yard. I used a silver sharpie to mark the final position of the turnout and to aid in placing the wood ties. The black sharpie is for marking rail to be trimmed.



In the below photo the first two mainline turnouts on the east end are in place and the ties have been glued down.



With the eastern mainline turnouts in place it was time to lay the mainline to connect to the other end and establish the curves through the yard. The "Fruit Can Express", as my son calls it, has arrived in Adena to help glue down the main. 



With the main line down I started forming the yard tracks using the orange 3D printed track spacers to maintain a 2 inch spacing. The marks at the bottom of the below photo are the outside rail location for each yard track.



The "Fruit Can Express" parks on yard track 1 during gluing.



While waiting for the adhesive caulk to dry in between gluing sessions, I began soldering feeders on completed tracks. This way my eager helper could test finished tracks afterwards.



Below, more yard tracks getting spaced and ready for gluing. In all Adena yard is eight tracks wide. I'll also note that for the yard tracks I cut out every 6th or 7th tie and re spaced the ties to give the track more of a secondary look. I apparently had forgotten how much work this was and my thought not to do it again but I'm glad I did.



View from the east end of Adena Yard.



The east yard ladder is almost complete in this photo.



The last switch in the main yard ladder only needed to be a straight #6 since the curve was nearly complete at that point.



Here's the last turnout for the shorter two south tracks in place. I found a low spot which I filled with flexible spackle and then stained black with my tie wash.



Finally in the below photo all east yard turnouts are in place and stained. I even organized my construction mess a little bit for the picture. 
I'll lay the two shorter yard tracks on the right once I have their opposing turnouts installed. But will have to wait for the next part in this series.