Wednesday, January 4, 2017

Wordless Wednesday #109

Benchwork construction continues with a segment behind the furnace.

2 comments:

  1. Interesting Chris ... will this area just have the "main" running through it? Just wondering ... thanks!

    ReplyDelete
    Replies
    1. This section will have the main running downgrade to "open" staging at a very abbreviated representation of Pine Valley Yard. Clearance from the wall to Humidifier(the object on the left) is about 7 inches. Enough room for the main line and a continuous run connecting track that will climb upwards. The open grid construction in this area is due to the diverging grades on the two tracks.

      Delete